D&R Optimization Services
Distillation and Reaction Optimization Solutions
Project Experience
Process Design and Operational Experience
1. Atmospheric and Vacuum Units
Have developed a data base including various crude types (Athabasca, Cold Lake, Christina Lake, Leona, Marlim etc.) validated from operating data for thermodynamics, simulation topology, cracked gas make, coking potential, and optimal HVGO/LVGO configuration.
i) Schedule “A” Design Packages (includes validated simulation, PFD generation, equipment
specification) for atmospheric and vacuum units:
a) Consumer’s Co-op Upgrader*, Regina Sask.- 2001, 25,000 BPD Design Suncor Feed
Operating consistently @ 28,000 BPD
b) Consumer’s Co-op Upgrader Debottleneck, Regina Sask – 2005, 32,000 BPD Design
Operating consistently @ 35,000 BPD
c) Imperial Oil (Esso) – 1999, 90,000 BPD drevamp
d) PetroJam* Jamaica, 2006, 30,000 BPD
e) BA Energy, Fort Saskatchewan – 2006, 30,000 BPD Design Vacuum Column
*Example package can be provided for reference upon request.
ii) Revamp/Debottleneck/Grass Roots evaluations
a) CNRL Horizon Project – 2001, 2006, 250,000 BPD base design
b) Syncrude – UE-1 Vacuum Column Expansion- 2001, up to 290,000 BPD
c) Suncor – Base plant Vacuum column debottleneck 2000, improve yields by 15%
d) PetroCanada Montreal – 2002, 40,000 BPD Vacuum Column change in crude
e) NW Upgrader – 2007 25,000 BPD, simulation/equipment validation
2. Fractionators (FCC/Coker)
Developed simulations, design basis and equipment specifications for:
a) FCC Fractionator debottleneck – Consumer’s Coop Refinery, Sask. 2007 ongoing
b) Bitumen Column debottleneck– Syncrude Fort McMurray, 1999, 2002
c) Coker Fractionator debottleneck – Suncor Fort McMurray, 2003
3. C2 and C3 splitters:
Schedule “A” Design Packages
a) C3 Splitter – Williams Redwater, 2000, grassroots
b) C2 Splitter – Imperial Oil Sarnia, 1997, revamp
c) C3 Splitter - Citgo, Lake Charles, 2004, grassroots
4. Gas plants
Schedule “A” design package (includes simulation validation, PFD, equipment specification)
a) 2 identical Demethanizers – Taylor Gas turboexpander plant 2000, increase ethane extraction and capacity
b) C3/C4 splitter – PetroCanada Montreal 2007, tighter product specifications
c) Entire Gas plant (demeth, de-eth, debut, deprop, C3& C2 splitter) Citgo Lake Charles 2004
5. Air Separation Units (ASU)
a) 300-600 TPD turnkey units, 2003-2005 (CO2 removal (PSA/TSA), main and booster compression, cryogenic distillation and heat recovery)
b) 3000 TPD Turnkey unit for gasification. Integrated ASU (nitrogen rejection) with gasification unit (China 2005).
6. Hydrogen Recovery Units
Designed membranes and PSA’s for BP Toledo (2004) , Marathon Robinson (2005),
Imperial Oil Sarnia (1996)
7. Hydrogen Plants (Steam Methane Reformers with CO2 Shift and back end PSA’s)
Developed design scope, simulation for following hydrogen plants
a) Giant Virginia, 2004, 15 mmscfd
b) Marathon Detroit, 2004, 60 mmscfd
c) Motiva Port Arthur, 2005, 100 mmscfd
d) Citgo Lemont, 2004, 30 mmscfd
8. Tailing Solvent Recovery Unit
Developed novel separation scheme to improve operation of Shell operation (2006)
Pilot plants for Synenco, PetroCanada, SGS
9. Flare System analysis
Imperial Oil Sarnia Refinery and Petrochemical site – Scenario analysis performed on system with
640 pressure relief valves (1995)
10. Refinery Energy, Fuel Gas, and Hydrogen Balance Analyses
Citgo Lemont, BP Toledo, Giant Virginia, PetroCanada Montreal, Conoco Phillips Wood River, BP
Whiting, 2003-2005
11. Selected Distillation Design Experience
Suncor Millennium Upgrader- Fort McMurray, 2000
Syncrude UE-1- Fort McMurray, 1999
PetroCanada, Keyera, Spectra BP extraction and gas plants 1998-2007